Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/14562
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorÁlvarez Pacheco, Carlos Oswaldo-
dc.contributor.authorParra Pilataxi, Jessica Estefanía-
dc.contributor.authorTierra Vilema, Jhon Jairo-
dc.date.accessioned2021-08-03T18:41:16Z-
dc.date.available2021-08-03T18:41:16Z-
dc.date.issued2020-11-06-
dc.identifier.citationParra Pilataxi, Jessica Estefanía Tierra Vilema, Jhon Jairo. (2020). Elaboración de un plan integral de gestión de riesgos laborales e implementación de señalética en la planta procesadora de quinua “Sumak Life”, ubicada en Guano, provincia de Chimborazo. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/14562-
dc.descriptionEl presente trabajo de titulación tuvo como objetivo primordial elaborar e implementar un Plan Integral de Gestión de Riesgos (PIGR) para el edificio principal, teatro hotel, teatro municipal y turismo pertenecientes al gobierno autónomo descentralizado del cantón Guano, con la finalidad de salvaguardar la vida, así como la integridad física de las personas que trabajan y visitan las instalaciones en estudio, en el momento que ocurra un evento natural o antrópico. El PIGR cuenta con cinco fases las cuales se refieren al análisis de riesgos, los lineamientos para reducir los riesgos, el manejo de una emergencia, la recuperación institucional y la validación, seguimiento y evaluación, bajo el formato de la Secretaria de Gestión de Riesgos Zonal 3. Se obtuvo un nivel de riesgo global medio de la institución frente a las amenazas a las que se encuentra expuesta, la identificación de los riesgos laborales se realizó con la utilización de la matriz de riesgos INSHT, y el análisis de riesgo de incendio estructural por medio del método MESERI. Se realizó la conformación de Brigadas de Emergencia y protocolos de actuación frente a un evento adverso, considerando el antes, durante y después de una emergencia, y el procedimiento para la recuperación post emergencia. La implementación de la señalética se ejecutó bajo la norma NTE INEN 3864-1 y la NTP 888:2010, para los equipos de protección contra incendios se tomó como referencia la norma NFPA 10. Se recomienda realizar capacitaciones periódicas, así como la revisión periódica de los equipos de protección contra incendios.es_ES
dc.description.abstractThe main objective of this research work was to develop and implement an Integral Risk Management Plan (PIGR) for the main building, hotel theater, municipal theater and tourism belonging to the Decentralized Autonomous Government of the canton Guano, in order to safeguard life, as well as the physical integrity of the people who work and visit the facilities under study, at the time of a natural or anthropic event. The PYGM has five phases which relate to risk analysis, risk reduction guidelines, emergency management, institutional recovery and validation, monitoring and evaluation, in the format of the Secretary of Zonal Risk Management 3. An average overall risk level was obtained from the institution against the threats to which it is exposed, the identification of occupational hazards was carried out with the use of the INSHT risk matrix, and the structural fire risk analysis using the MESERI method. Emergency Brigades and protocols of action were formed in the face of an adverse event, considering the before, during and after of an emergency, and the procedure for post- emergency recovery. The implementation of the signaling was implemented under NTE INEN 3864-1 standard and NTP 888:2010, for fire protection equipment NFPA10 standard was taken as a reference. Regular trainings are recommended, as well as regular review of fire protection equipment.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00578-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectMITIGACIÓN DE RIESGOSes_ES
dc.subjectSEGURIDAD Y SALUD OCUPACIONALes_ES
dc.subjectPROTOCOLOS DE ACTUACIÓNes_ES
dc.subjectBRIGADAS DE EMERGENCIASes_ES
dc.subjectMÉTODO MESERIes_ES
dc.titleElaboración de un plan integral de gestión de riesgos laborales e implementación de señalética en la planta procesadora de quinua “Sumak Life”, ubicada en Guano, provincia de Chimborazoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalCayán Martínez, Juan Carlos-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00578.pdf3,71 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons