Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/6028
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorReyes Vásquez, John Paúl-
dc.contributor.authorAldás Salazar, Darwin Santiago-
dc.date.accessioned2017-02-10T16:02:33Z-
dc.date.available2017-02-10T16:02:33Z-
dc.date.issued2016-09-
dc.identifier.citationAldás Salazar, Darwin Santiago. (2016). Programación de la producción de calzado de seguridad basado en la teoría de restricciones para la mejora de la productividad en la Empresa Marcia- Buffalo Industrial. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/6028-
dc.descriptionSe realizó un estudio de los parámetros de producción en la empresa de calzado de seguridad MARCIA BUFALO INDUSTRIAL; como: inventario en proceso por sus siglas en inglés (WIP), tiempo de ciclo (CT) y tasa de producción de unidades vendibles throughput (TH), los parámetros se obtienen de la teoría de restricciones propuesta por Goldratt y luego se las evaluó con la Ley de Little que propone Hopp y Spearman, se aplicó el estudio realizado para programar la producción de calzado de seguridad que permitirá utilizar la capacidad máxima de la línea, elevando el TH, reduciendo el CT y manteniendo un WIP constante a través de la reducción de los desperdicios de tiempo generado en los procesos. Para evaluar el caso actual y el propuesto, se utilizó un software de simulación Promodel® versión estudiantil, con el cual se programó algoritmos de secuencia de operaciones, parámetros de producción para el mejor caso posible que permita elevar la productividad de la empresa. Como resultado se obtuvo las cantidades optimas de producción para un ciclo de trabajo de 8 horas, elevando el throughput de 0,50 pares / min a 0,53 pares/ min, reduciendo el CT de 478,83 min a 450,3 min, teniendo un aumento en la producción, de 10 pares de calzado de seguridad en una jornada, además se determinó, que el inventario en proceso optimo por cada hora de trabajo es de 32 pares. Finalmente se genera una secuencia de operaciones a través de un diagrama de Gantt para una programación óptima de producción, en el que para una orden de 520 pares del calzado en estudio se gana 66 minutos en el ciclo de trabajo al mantener un inventario en proceso constante. Este estudio puede aplicarse en empresas de calzado que presenten similares características del caso investigado.es_ES
dc.description.abstractA study was about made about the parameters within the safety shoemaking factory MARCIA BUFALO INDUSTRIAL, such as: work in process for its acronym in English (WIP), CYCLE TIME (CT) and the throughput sold units of production rate (TH), the parameters were obtained based on the theory of restrictions proposed by Goldratt and then this was evaluated with the Little Law that proposes Hopp and Spearman, the made study was applied to program the safety shoe production that will allow to use the line maximum capacity, by increasing the TH, decreasing the CT and keeping a constant WIP by means of the reduction of the wasting time performed in the processes. To evaluate the current case and the proposed, a simulation program software Promodel® was used, in its student version, with which the sequence algorithms were programmed, production parameters for the best case that increases the productivity of the factory. Therefore, the optimal quantities of production for a work cycle of 8 horas were obtained, by increasing the throughput of 0,5 pairs/min, decreasing the CT of 487,83 min to 450,3 min, and having an increase in the production, of 10 safety shoes in a work cycle. Furthermore, it was determined that the inventory in optimal process per each hour of work is of 32 pairs. Finally, a sequence of operations through a Gantt diagram for the optimal production programming was generated, in this for a petition of 520 shoe pairs in the study 66 min are gained in the work cycle to keep a constant work in process. This study could be applied in shoemaking factories that present the same characteristics of the investigated case.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T00769-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectTECNOLOGÍA DE LOS PROCESOS INDUSTRIALESes_ES
dc.subjectPRODUCTIVIDADes_ES
dc.subjectPROGRAMACIÓN DE LA PRODUCCIÓNes_ES
dc.subjectTEORÍA DE RESTRICCIONESes_ES
dc.subjectINVENTARIO EN PROCESOes_ES
dc.subjectTIEMPO DE CICLOes_ES
dc.subjectCUELLO DE BOTELLAes_ES
dc.titleProgramación de la producción de calzado de seguridad basado en la teoría de restricciones para la mejora de la productividad en la Empresa Marcia- Buffalo Industrial.es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalRosero Mantilla, César Aníbal-
dc.contributor.miembrotribunalMorales Perrazo, Luis Alberto-
dc.rights.urihttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Proyectos de Investigación y Desarrollo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T00769.pdf3,95 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons