dc.identifier.citationCastillo Santillán, Ángel Vinicio. (2017). Propuesta de mantenimiento centrado en confiabilidad de las unidades de bombeo horizontal multietapas del Sistema Power Oil de la Estación Atacapi del B57-LI de Petroamazonas. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/6300-
dc.descriptionEl presente trabajo tienecomoobjetivo realizar la propuesta de unplan de MantenimientoCentrado en Confiabilidad(RCM)de la unidad de bombeo horizontal multietapas HPS delsistema Power Oil,dentro del Bloque 57 Libertador, Provincia de Sucumbíos,Parroquia:Dureno, estación Atacapi, por cuanto la alta tasa de fallas imprevistas de la unidad haocasionado que el sistema esté inoperativo en variosperíodosde tiempo,provocandopérdidasque comprometen la producción de petróleo del campo, para ello: se analizó el contextooperacional de los equipos que componen la unidadHPSconfirmandoque están dentro de sucontexto de diseño,se recabarondatos históricos del sistemaMáximoOil & Gas de losaños2014-2015,se calculóy determinóla tasa de fallas de los equiposy launidad HPS,seanalizóy valoró losmodos de fallasegún lanorma ISO 14224-2006, conestos datossedesarrolló elanálisis de modos de falla y sus efectos(AMFE)obteniendo lashojas de información de cadauno de los equipos,con la aplicación del diagrama de decisión RCM II se obtuvieron las hojasde decisión, en las cuales se indica las tareas propuestas para controlar cada uno de los modosde falla,lastareasplanteadas sonlógicas y realizables,finalmente se obtuvo el plan RCM paralaunidad de bombeo horizontal HPS.Con la aplicación de la metodología se comprueba que esfactible la reducción de la tasa de fallos obteniendo una mejora desdeuna tasa de fallos de0.00142a 0.0006, es decir de un tiempo medio entre fallas de 29a 69 días.En vista de losresultados esperados, se recomienda la aplicación inmediata de la propuesta.es_ES
dc.description.abstractThe present work aims to realize the proposal of a Reliability Centered Maintenance Plan(RCM) of the HPS multi-stage horizontal pumping unit of the power oil system, within Block57 Libertador, Sucumbios Province, Dureno Parish, Atacapi Station, for As the high rate ofunforeseen failure of the unit has caused the system to be inoperative in several periods of time,causing losses that compromise the oil production of the field, for it: the operational context thatthe equipment that compose the HPS unit was analyzed Confirming that they are within theirdesign context, historical data were collected from the Maximo Oil & Gas system from theyears 2014-2015, the failure rate of the equipment and the HPS unit was calculated anddetermined. Failure according to ISO 14224-2006, with this data was developed the analysis offault modes and their effects (AMFE) obtaining the information sheets of each of theequipment, with the application of the decision diagram RCM II, the Decision sheets, whichindicate the tasks proposed to control each failure mode, the tasks are logical and feasible,finally the RCM plan for the horizontal pump unit HPS was finally obtained. With theapplication of the methodology it is verified that it is feasible to reduce the failure rate byobtaining an improvement from failure rate of 0.00142 to 0.0006, that is, a mean time betweenfailures of 29 to 69 days. In view of the expected results, the immediate implementation of theproposal is recommended.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T00831-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectINGENIERÍA EN MANTENIMIENTOes_ES
dc.subjectMANTENIMIENTO CENTRADO EN CONFIABILIDAD (RCM)es_ES
dc.subjectANÁLISIS DE MODOS DE FALLA Y SUS EFECTOS (AMFE)es_ES
dc.subjectDIAGRAMA DE DECISIÓN RCM IIes_ES
dc.subjectBLOQUE 57 LIBERTADORes_ES
dc.titlePropuesta de mantenimiento centrado en confiabilidad de las unidades de bombeo horizontal multietapas del Sistema Power Oil de la Estación Atacapi del B57-LI de Petroamazonas.es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalCarrión Cevallos, Mónica-
dc.contributor.miembrotribunalPérez Guerrero, Julio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Proyectos de Investigación y Desarrollo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T00831.pdf1,76 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons