Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/6342
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCayán Martínez, Juan Carlos-
dc.contributor.authorPinta Pinduisaca, Nancy Verónica-
dc.contributor.authorCarvajal Gavilanez, Rusbel Gerardo-
dc.date.accessioned2017-05-08T17:04:33Z-
dc.date.available2017-05-08T17:04:33Z-
dc.date.issued2017-01-24-
dc.identifier.citationPinta Pinduisaca, Nancy Verónica; Carvajal Gavilanez, Rusbel Gerardo. (2017). Diagnóstico para la implementación del plan integral de gestión de riesgos, señalética y defensa contra incendios en la Empresa Inox Industrial. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/6342-
dc.descriptionSe ha realizado el Diagnóstico para la implementación del Plan Integral de Gestión de Riesgos, Señalética y Defensa contra Incendios en la empresa INOX INDUSTRIAL, con el fin de preservar la integridad física de los trabajadores y visitantes, asi como también salvaguardar la infraestructura del lugar, por medio de normativas nacionales e internacionales. Para realizar el diagnóstico del Plan Integral de Gestión de Riesgos se utilizó el modelo proporcionado por la Secretaria de Gestión de Riesgos (SGR), el cual analiza cinco fases, la primera hace mención a la caracterización de la entidad, la segunda comprende los lineamientos a seguir para la reducción de riesgos, la tercera hace referencia al manejo de una emergencia, la cuarta contempla la recuperación institucional y la quinta agrupa los cuatro componentes que procura que la implementación del Plan Integral de Gestión de Riesgos (PIGR) sea efectivo, todo eso se obtuvo a través de fichas, mapas y aplicación de normativas. Como resultado del diagnóstico se encontró la inadecuada y escasa señalética por lo cual se concluye la necesidad de proponer la implementación de señalética bajo las normas INEN 3864-1:2013 y NTP 399.010-1. Además, las instalaciones de la empresa no cuentan con el suficiente equipo de defensa contra incendios, es así que se propone la instalación de extintores de acuerdo a la norma NFPA10, componentes como detectores de humo, lámparas de emergencia y sirenas de emergencia aplicando la norma NFPA72. Se recomienda realizar la actualización del Plan Integral de Gestión de Riesgos, ya que éste fue elaborado en base a la situación actual; y presentarlo en la Secretaria de Gestión de Riesgos para que ellos lo aprueben y certifiquen el mismo.es_ES
dc.description.abstractThe diagnosis was made for the implementation of the Comprehensive Risk Management, Wayfinding and Fire Protection Plan at INOX INDUSTRIAL, in order to preserve the physical integrity of workers and visitors, as well as to safeguard the infrastructure of the place, by means of national and international regulations. For the diagnosis of the Comprehensive Risk Management Plan, the model provided by the Secretary of Risk Management (SGR) was used, which analyzes five phases, the first makes reference to the characterization of the entity, the second comprises the following guidelines for the reduction of risks, the third refers to the management of an emergency, the fourth contemplates the institutional recovery and the fifth groups the four components that seeks to implement the Comprehensive Plan for Risk Management (CPRM) is effective, all this was obtained through tabs, maps and application of regulations. As a result of the diagnosis, the inadequate and scarce signaling was found, which concludes the need to propose the implementation of signage under the standards INEN 3864-1:2013 and NTP 399.010-1. In addition, the company’s facilities do not have enough fire protection equipment, so it is proposed to install fire extinguishers according to NFPA10, components such as smoke detectors, emergency lamps and emergency sirens applying the Norm NFPA 72. It is recommended to carry out the update of the Comprehensive Risk Management Plan, since this was elaborated based on the current situation, and present it in the Risk Management Secretary for them to approve it and certify it.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00416-
dc.rightsInfo:eu-repo/semantics/openAccesses_ES
dc.subjectPLAN INTEGRAL DE GESTIÓN DE RIESGOS (PIGR)es_ES
dc.subjectSECRETARÍA DE GESTIÓN DE RIESGOS (SGR)es_ES
dc.subjectSEÑALÉTICAes_ES
dc.subjectMAPA DE EVACUACIÓNes_ES
dc.subjectNORMA TÉCNICA PERUANA (NTP)es_ES
dc.subjectTECNOLOGÍA DE LOS PROCESOS INDUSTRIALESes_ES
dc.subjectRIOBAMBA (CANTÓN)es_ES
dc.titleDiagnóstico para la implementación del plan integral de gestión de riesgos, señalética y defensa contra incendios en la Empresa Inox Industriales_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalÁlvarez Pacheco, Carlos Oswaldo-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00416.pdf4,19 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons