Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/9195
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorRodríguez Flores, Jesús Alberto-
dc.contributor.authorOjeda Coronado, Jhofre Eduardo-
dc.date.accessioned2018-11-21T19:38:31Z-
dc.date.available2018-11-21T19:38:31Z-
dc.date.issued2018-03-
dc.identifier.citationOjeda Coronado, Jhofre Eduardo. (2018). Desarrollo de la fase uno del pmbok para un sistema instrumentado de seguridad en el control de procesos de la estación páramo de ocp. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/9195-
dc.descriptionEl presente trabajo de titulación tuvo como objetivo el desarrollo de la fase uno del Project Management Body of Knowledge (PMBOK) para un Sistema Instrumentado de Seguridad (SIS) en el control de procesos de la estación de bombeo “Páramo” de Oleoducto de Crudos Pesados (OCP). Se identificaron los peligros y riesgos presentes utilizando los análisis de riesgos y operatividad (HAZOP) para la ejecución del análisis de capas de protección (LOPA) y obtención de los niveles de integridad de seguridad objetivos (SIL objetivo) en base a los estándares internacionales IEC: 61511 y ANSI/ISA 84. Se identificaron cuatro funciones instrumentadas de seguridad (SIF) y una recomendación a diseñar para reducir los riesgos a niveles tolerables. Posteriormente se desarrolló las especificaciones de requisitos de seguridad (SRS) y el cálculo de la probabilidad de falla en demanda promedio (PFDavg) de las SIFs diseñadas que ejecuta el SIS, lo que estableció un primer ejercicio acerca de los planes de acción a ser ejecutados para alcanzar el nivel de riesgo adecuado obtenidos en el LOPA. Se concibió la ingeniería del detalle de las SIFs y la recomendación, se obtuvo la arquitectura del SIS; para validar el proyecto se realizó una evaluación del mismo verificando la reducción de riesgo y obtención de los niveles SIL exigidos, en base al diseño y requerimientos definidos se obtuvieron los diagramas de tuberías e instrumentación (P&ID) del SIS y la matriz de causa efecto (MCE) para la lógica de programación del PLC de seguridad (SPLC), basados en el estándar IEC: 61508 se seleccionó la instrumentación del SIS y finalmente se obtuvo una evaluación económica de equipos mayores del proyecto. Se concluyó que al contar con un SIS independiente del sistema básico de control de procesos (BPCS) es posible alcanzar la seguridad funcional en la estación de bombeo, al presentarse cualquier desviación atípica al proceso ayuda a llevar a un estado seguro a la estación, se ha determinado que es imperioso cumplir con los estándares internacionales IEC: 61511, IEC: 61508 y ANSI/ISA 84. Se recomienda que se desarrollen SIS para las demás estaciones que forman el oleoducto de OCP.es_ES
dc.description.abstractThe present research was carried out with objective of developing phase one of the Project Management Body of Knowledge (PMBOK) for a Safety Instrumented System (SIS) in the process control at Páramo station from “Oleducto de Crudos Pesados” (OCP). Danger and risk were identified using the hazard and operational analysis (HAZOP) fro execution from layer of protection analysis (LOPA) and achievement of objective safety integrity levels (SIL targets) base on international standards. IEC: 61511 and ANSI/ISA 84. Four safety instrumented functions (SIF) were identified and recommendation to be designed to reduce the levels to tolerable levels. Then, it developed the safety requirement specifications (SRS) and calculation of probability failure in demand average (PFDavg) of the designed SIFs tan execute SIS, which established a first excercise about the action plans to be execute to reach the level of appropiate risk obtained in the LOPA. The engineering details was conceived SIFs and the recommendation, therefore, it was obtained the architecture SIS; to valide the project a revaluation of Project was carried out verifying rick reduction and obtaining the required SIL levels. It based on desing and defined requirements, pipeline and instrumentation diagrams of SIS and cause-effect matrix (MCE) were obtained for programming logic of safety PLC (SPLC), base don standard IEC: 61508 the instrumentation at SIS was selected and after an economic evaluation major equipment of Project was obtained. It is concluded that by having SIS independent of the basic process control system (BPCS), it is posible to achieve functional safety in pumping station, at occurrence of atypical deviation, process helps to bring the station to a safe state. It has determined that it is imperative to comply with international standards IEC: 61511, IEC:61508 and ANSI/ISA 84. It is recommended that SIS be developed for the other stations that make up the OCP pipelinees_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFIYE;108T0242-
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectTECNOLOGÍA DEL CONTROL AUTOMÁTICOes_ES
dc.subjectSISTEMA INSTRUMENTADO DE SEGURIDAD (SIS)es_ES
dc.subjectFUNCIÓN INSTRUMENTADA DE SEGURIDAD (SIF)es_ES
dc.subjectNIVEL DE INTEGRIDAD DE SEGURIDADes_ES
dc.subjectIEC: 61511 (ESTÁNDAR)es_ES
dc.subjectESPECIFICACIONES DE REQUISITOS DE SEGURIDAD (SRS)es_ES
dc.subjectIEC: 61508(ESTÁNDAR)es_ES
dc.titleDesarrollo de la fase uno del pmbok para un sistema instrumentado de seguridad en el control de procesos de la estación páramo de ocpes_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalPaucar Samaniego, Jorge Luis-
Aparece en las colecciones: Ingeniero en Electrónica, Control y Redes Industriales; Ingeniero/a en Electrónica y Automatización

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
108T0242.pdf8,32 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.