Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/4851
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAndrade, Mónica-
dc.contributor.authorQuindigalle Quindigalle, Martha Fabiola-
dc.date.accessioned2016-06-03T21:29:26Z-
dc.date.available2016-06-03T21:29:26Z-
dc.date.issued2016-01-
dc.identifier.citationQuindigalle Quindigalle, Martha Fabiola. (2016). Diseño de un Sistema de tratamiento de aguas residuales en el Caserio el Topo, parroquia Río Negro, cantón Baños de Agua Santa.Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/4851-
dc.descriptionSe diseñó un Sistema de Tratamiento de aguas residuales en el Caserio El Topo, parroquia Río Negro, cantón Baños de Agua Santa, con el objetivo de obtener agua tratada disminuyendo los parámetros que se encuentren fuera del límite permisible según el Texto Unificado de Legislación Secundaria del Ministerio del Ambiente para reducir el impacto ambiental en el ecosistema y los medios hídricos, con este fin se realizó la caracterización físico-química y microbiológica del agua residual procedente de la comunidad Caserío El Topo, se identificó los contaminates más importantes y se realizaron las pruebas de tratabilidad para el diseño respectivo. Como resultados se obtuvo que luego del sistema de desbaste el agua residual paso al humedal artificial de flujo horizontal subsuperficial que ocupará una área superficial de 249,〖88 m〗^2 y un porcentaje de remoción de la Demanda Bioquímica de Oxígeno – DBO5 con el Junco 79,07 %, del detergente 60 % y aceites y grasas 68,96 % mediante la degradación biológica posteriormente el agua residual paso por un proceso de coagulación y floculación en el que se obtuvo un porcentaje de remoción de detergente del 25 %, y por último el agua residual se dirigió a un sedimentador con capacidad de 5,124 m3 para la separación de lodos procedentes del floculador. El diseño seleccionado fue validado con los resultados de los parámetros utilizados en el diseño del humedal artificial de flujo horizontal subsuperficial, concluyéndose en los valores determinados: Demanda bioquímica de oxígeno 18 mg/L, Demanda química de oxígeno 33 mg/L y detergentes, 0,8 mg/L y los análisis del proceso de floculación y coagulación el detergente tiene un valor de 0,6 mg/L. Se recomienda que la cantidad o fracción de lodos que no es recolectado en el humedal artificial se remueva en el lecho de secado que por el proceso de deshidratación se solidifica para luego utilizarse como compostaje o fertilizante.es_ES
dc.description.abstractA wastewater treatment system was desinged in “El Topo” village from Río Negro parish, in Baños de Agua Santa Canton, with the propose to obtain treated water decreasing the parameters which are outside the permissible limit according to unified text of secondary law form Ministry of Environment in order to reduce the environmental impacto on the ecosystem and water resources, with this aim were developed the physicochemical and microbiological description of the waste water from village El Topo, the most important pollutants are identified and treatability tests for the respective design were made. As a results it was found that after roughing system the waste water was changed to the wetland subsurface of horizontal flow which took a surfrace area with 249,88m2 and removal percentage of Biochemical Oxygen Demand-BOD; Junco with 79.07%, detergent with 60%, oils and greases with 68,96%, through biological degradation, subsequently the waste water changed through a coagulation and flocculation process in which was obtained a detergent removal percentage with 25%, and finally the wastewater is going into a settler with capacity of 5,124m3 for the separation of sludge which come from the flocculator. The selected desing was validated with the results from parameters used in the desing of artificial wetland subsurface of horizontal flow, concluding in certain values: Biochemical oxygen demand 18 ml/L, chemical oxygen demand 33mg/L and detergent 0,8 mg/L and analysis of coagulation and flocculation proccess the detergent has a value of 0,6 mg/L. It is recomemended that the amount or sludge fraction which are not collected from the artificial wetland is removed in drying bed that by the dehydration process is solidified and the used as compost or fertilizer.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazo.es_ES
dc.relation.ispartofseriesUDCTFC;96T00333-
dc.subjectDISEÑO DE UN SISTEMA DE TRATAMIENTO DE AGUASes_ES
dc.subjectHUMEDAL ARTIFICIALes_ES
dc.subjectFLUJO HORIZONTAL SUBSUPERFICIALes_ES
dc.subjectFLOCULADORes_ES
dc.subjectCANAL DE PARSHALLes_ES
dc.subjectINGENIERÍA QUÍMICAes_ES
dc.subjectTEXTO UNIFICADO DE LEGISLACIÓN SECUNDARIA (TULSMA)es_ES
dc.subjectAGUAS RESIDUALESes_ES
dc.subjectCASERÍO EL TOPO (COMUNIDAD)es_ES
dc.subjectBAÑOS DE AGUA SANTA (CANTÓN)es_ES
dc.subjectTUNGURAHUA (PROVINCIA)es_ES
dc.titleDiseño de un Sistema de tratamiento de aguas residuales en el Caserio el Topo, parroquia Río Negro, cantón Baños de Agua Santa.es_ES
dc.typebachelorThesises_ES
dc.contributor.miembrotribunalCalderón, Hugo-
Aparece en las colecciones: Ingeniero/a Químico/a

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
96T00333.pdf7,52 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.