Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/15997
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCajamarca Villa, Julio Eduardo-
dc.contributor.authorLatorre Olivo, Flavio Aníbal-
dc.contributor.authorVilla Cayambe, Ronal Aníbal-
dc.date.accessioned2022-06-20T16:44:34Z-
dc.date.available2022-06-20T16:44:34Z-
dc.date.issued2021-12-23-
dc.identifier.citationLatorre Olivo, Flavio Aníbal; Villa Cayambe, Ronal Aníbal. (2021). Propuesta de rediseño del circuito eléctrico y de tableros de control con plan de mantenimiento de los sistemas de las áreas de preparación y fabricación de la Planta PISMADE S.A. Riobamba. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/15997-
dc.descriptionEl presente trabajo tiene como objetivo elaborar una propuesta de rediseño eléctrico y un plan de mantenimiento centrado en la confiabilidad para los sistemas de la planta PISMADE SA, para lo cual se realizó una inspección del estado del cableado y una evaluación cualitativa de los tableros, seguido de ello se diseñó los nuevos circuitos eléctricos, de control y subtableros bajo la norma UNE EN 60617-2, por último se recolectó parámetros y datos técnicos para los cálculos y selección de los componentes eléctricos. Simultáneamente se realizó un plan de mantenimiento basado en la metodología del RCM, comenzando con el levantamiento de información de 18 sistemas con sus 96 equipos codificándolos bajo la norma ISO 14224 hasta un cuarto nivel jerárquico, posteriormente se elaboró las fichas técnicas para los sistemas y equipos, además se elaboraron las tablas del contexto operacional y el análisis de criticidad de manera cualitativa, a continuación se aplicó la metodología del RCM, desarrollando las hojas de información en donde se detalló las funciones, modos de fallo, efectos de fallo y consecuencias del fallo de los equipos, para terminar se realizó las hojas de decisión donde se obtuvo las tareas para el plan de mantenimiento, finalmente se estableció un cronograma y su logística requerida para un año. Se concluye que con el rediseño del circuito eléctrico disminuirá las perdidas energéticas, riesgos al personal y a los sistemas, a la par que el rediseño de los tableros de control mejorará y facilitará las operaciones de producción, además con la ejecución del plan de mantenimiento se determinó las tareas más apropiadas para atacar cada uno de los modos de fallo y reducir los costos relacionados al mantenimiento hasta $18.835,27 dólares. Por lo que se recomienda instalar los tableros de distribución para cada área y el cambio de modelo de mantenimiento actual que asegure una mayor disponibilidad de los sistemas.es_ES
dc.description.abstractThe objective of this work is to prepare an electrical redesign proposal and a maintenance plan focused on reliability for the systems of PISMADE SA, for which an inspection of the state of the wiring and a qualitative evaluation of the panels was carried out, followed by, the new electrical, control and sub-panel circuits were designed under the UNE EN 60617-2 standard. Lastly, parameters and technical data were collected for the calculations and selection of the electrical components. Simultaneously, a maintenance plan was carried out based on the RCM methodology, beginning with the collection of information from 18 systems with their 96 pieces of equipment coded under ISO 14224 standard up to a fourth hierarchical level. Later the technical sheets for the systems and equipment were prepared. In addition, the charts of the operational context and the criticality analysis were prepared qualitatively. Then, the RCM methodology was applied, developing the information sheets detailing the functions, failure modes, failure effects and consequences of the failure of the equipment. To close the decision sheets were made where the tasks for the maintenance plan were obtained, finally a schedule and its logistics required for a year were established. It is concluded that the redesign of the electrical circuit will reduce energy losses, risks to personnel and systems, while the redesign of the control panels will improve and facilitate production operations, in addition to the execution of the maintenance plan is shortened. the most appropriate tasks to attack each of the failure modes and reduce maintenance-related costs up to $18,835,27 dollars. Therefore, it is recommended to install distribution panels for each area and change the current maintenance model to ensure greater availability of the systems.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;25T00423-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectGESTIÓN DE MANTENIMIENTOes_ES
dc.subjectREDISEÑO ELÉCTRICOes_ES
dc.subjectTABLERO DE CONTROLes_ES
dc.subjectMANTENIMIENTO BASADO EN LA CONFIABILIDAD (RCM)es_ES
dc.subjectDIAGRAMAS ELÉCTRICOSes_ES
dc.titlePropuesta de rediseño del circuito eléctrico y de tableros de control con plan de mantenimiento de los sistemas de las áreas de preparación y fabricación de la Planta PISMADE S.A. Riobambaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalMontalvo Jaramillo, Pablo Ernesto-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero de Mantenimiento; Ingeniero/a en Mantenimiento Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
25T00423.pdf4,15 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons