Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/18115
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMejía Flores, Marco Antonio-
dc.contributor.authorCarvajal Granizo, Willian Francisco-
dc.date.accessioned2023-01-27T15:45:56Z-
dc.date.available2023-01-27T15:45:56Z-
dc.date.issued2022-12-12-
dc.identifier.citationCarvajal Granizo, Willian Francisco. (2022). Plan de cierre parcial del frente norte de la concesión minera “Guadalupe Acumulada” código 290417 ubicada en el sector Huertos familiares Caminos al sol, cantón Riobamba, provincia de Chimborazo. Escuela Superior Politécnica de Chimborazo. Macas.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/18115-
dc.descriptionEl objetivo del Proyecto Técnico fue realizar una propuesta de diseño de cierre parcial de una cantera de materiales de construcción árido y pétreo en la concesión minera “Guadalupe Acumulada” código 290417. La metodología y resultados obtenidos fueron los siguientes: en el frente norte se estableció un diseño tecnificado en donde se determinó parámetros geológicos, geotécnicos y físico mecánicos del macizo rocoso, el diseño geométrico del talud de liquidación, el volumen de material de remoción, al igual que la propuesta correctiva y de restauración de talud. El diseño de explotación antitécnica que se ha generado durante varios años ha sido motivo de inestabilidad de taludes, impactos ambientales negativos y sociales. En el diseño técnico de cierre parcial del frente norte se presentó un diseño adecuado a través del método de corte aplicado por bancos descendentes con una profundidad máxima de 38 m en una distancia de 170,55 m desde el frente N-E hasta el frente S-E, con alturas de banco de 8 m y un ancho de berma de seguridad de 5,5 m., el ángulo de talud de liquidación fue de 60° en cada banco con un ángulo de talud de trabajo de 38° de banco total, el avance de extracción de la cantera fue de N-E con un volumen total de material de remoción de 116465,805 m3 en un área de 19357 m2 con un factor de seguridad de 1.552140 por el método Bishop, 1.440640 por el método Janbu y 1.544180 por el método GLE. Se concluye que la propuesta correctiva y de restauración de talud fue establecida y controlada mediante el plan de manejo ambiental, de desarrollo minero, de cierre y de operaciones definitivo, por lo tanto, se recomienda la difusión de la información a los pobladores que estén interesados en el otorgamiento de derechos mineros.es_ES
dc.description.abstractThe technical project aims to make a technical design proposal for the partial closure of a quarry of aggregate and stone construction materials. The partial closure plan of the mining concession "Guadalupe Acumulada" code 290417 will be carried out in the north front by parameters such as the technical design where geological, geotechnical and physical-mechanical parameters of the rock mass, its geometric design of the settlement slope, its volume of removal material and its corrective proposal and slope restoration will be determined. The anti-technical exploitation design that has been in place for several years has caused slope instability, negative environmental and social impacts. In the technical design for the partial closure of the north face, it is proposed to present an adequate design where it was determined: The cutting method will be done by descending banks with a maximum depth of 38 m in a distance of 170.55 m from the N-E to the S-E face, with bank heights of 8 m and a safety berm width of 5.5 m. The settlement slope angle is 8.5 m, with a maximum depth of 38 m and a safety berm width of 5.5 m. The settlement slope angle is 60° on each bench with a working slope angle of 38° total bench, the quarry extraction advance will be from N-E with a total removal material volume of 116465.805 m3 in an area of approximately 19357 m2 with a safety factor of 1. 552140 by the Bishop method, 1.440640 by the Janbu method and 1.544180 by the GLE method, will be remediated and reforested with native species such as eucalyptus, cabuyo, sigse, pine and burillo. The corrective proposal and slope restoration are governed and controlled by the environmental management plan and mining development plan, as well as its closure plan and definitive operations.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFRN;53T0061-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectADSORCIÓNes_ES
dc.subjectCOMPACIDADes_ES
dc.subjectCÍRCULO DE FALLAes_ES
dc.subjectLODOes_ES
dc.titlePlan de cierre parcial del frente norte de la concesión minera “Guadalupe Acumulada” código 290417 ubicada en el sector Huertos familiares Caminos al sol, cantón Riobamba, provincia de Chimborazo.es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalCarrillo Barahona, William Estuardo-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniería en Geología y Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
53T0061.pdf3,21 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons