Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/21228
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorViteri Barrera, Marco Antonio-
dc.contributor.authorGuevara Hidalgo, Danny Joel-
dc.contributor.authorTibanquiza Chuncho, Santiago Efraín-
dc.date.accessioned2024-06-04T16:11:52Z-
dc.date.available2024-06-04T16:11:52Z-
dc.date.issued2021-11-04-
dc.identifier.citationGuevara Hidalgo, Danny Joel; Tibanquiza Chuncho, Santiago Efraín. (2021). Implementación de un sistema remoto para control y monitoreo de procesos utilizando un PLC con Gateway IIOT. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/21228-
dc.descriptionEl presente proyecto técnico tuvo como objetivo la implementación de un sistema remoto para control y monitoreo de procesos utilizando un Controlador Lógico Programable (PLC) con Gateway IoT Industrial (IIoT). El sistema consta de 3 subprocesos, uno de tipo neumático compuesto por PLC que procesa señales, sensores magnéticos y activan las bobinas dentro de las válvulas, dando el movimiento de los pistones. Un control de luces indicadoras que se encienden dependiendo de la programación. Un control térmico utilizando un módulo SB 1231 RTD para la lectura del sensor de temperatura PT 100, que indica el valor de la temperatura y, mediante la acción de un foco incandescente y un ventilador, en donde mediante estos actuadores se intenta alcanzar la consigna establecida por programación, mediante un controlador Proporcional Integral Derivativo (PID).El sistema de comunicación implementado con un Gateway IIoT marca EWON-FLEXY que es el enlace a internet mediante conexión de una red virtual privada (VPN) a través del programa eCatcher así se podrá controlar la subida y cambio de programas al PLC, además actúa como servidor para la interfaz hombre máquina (HMI) programado en lenguaje HTML, mediante el software VIEWON. Para ver en tiempo real se configuró una cámara IP. Como resultados de las pruebas se determinó que la conexión de datos fue exitosa de todas las pruebas realizadas concluyendo que el sistema tenga una estabilidad del 100% solo dependiendo únicamente de la conexión a internet tanto en el laboratorio como en el lugar remoto de pruebas. La velocidad que le tomó al sistema en establecer la conexión desde un lugar remoto es menor a 345 ms, se concluye que el sistema tiene un tiempo de latencia de comunicación del ordenador al PLC aceptable. Se recomienda instalar un sistema de respaldo de energía para el constante funcionamiento del módulo didáctico.es_ES
dc.description.abstractThe aim of this technical research project was to implement a remote system for process control and monitoring using a Programmable Logic Controller (PLC) with Industrial IoT Gateway (IIoT). The system consists of 3 sub-processes: the first is pneumatic and composed of a PLC that processes signals, magnetic sensors and activates the coils inside the valves, moving the pistons; the second is a control for indicator lights, which come on depending on the programming and the third is a thermal control using an SB 1231 RTD module to read the PT 100 temperature sensor, which indicates the temperature value and mediates an incandescent bulb and a fan, whereby these actuators work to reach the programmed set point, by means of a Proportional-Integral-Derivative (PID) controller. The communication system was implemented with an EWON-FLEX brand IIoT Gateway. This links to the internet through a virtual private network (VPN) connection through the eCatcher program to control the upload and change of programs to the PLC; it also acts as a server for the human-machine interface (HMI) programmed in HTML language, using VIEWON software. An IP camera was configured for real-time vision. The test results determined that the data connection was successful in all the tests performed. It was concluded that the system has 100% stability, depending only on the internet connection both in the laboratory and the remote test site. The speed it took for the system to establish a connection from a remote location was less than 345 ms. It was thus concluded that the system has an acceptable communication latency time from the computer to the PLC. It is recommended that a backup power system be installed for the constant operation of the didactic module.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFIYE;108T0388-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÌA DEL CONTROL AUTOMÀTICOes_ES
dc.subjectPROCESOS INDUSTRIALESes_ES
dc.subjectINTERNET DE LAS COSAS INDUSTRIAL (IIOT)es_ES
dc.subjectPUERTA DE ENLACE IIOTes_ES
dc.subjectPROCESO NEUMÁTICOes_ES
dc.subjectCONTROL TÉRMICOes_ES
dc.subjectLATENCIAes_ES
dc.titleImplementación de un sistema remoto para control y monitoreo de procesos utilizando un PLC con Gateway IIOT.es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalPacheco Cunduri, Mayra Alejandra-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero en Electrónica, Control y Redes Industriales; Ingeniero/a en Electrónica y Automatización

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
108T0388.pdf3,31 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons