Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/4474
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSexto Cabrera, Luis Felipe-
dc.contributor.authorBenítez Santillán, Iván Leonardo-
dc.date.accessioned2016-02-12T15:01:33Z-
dc.date.available2016-02-12T15:01:33Z-
dc.date.issued2015-12-
dc.identifier.citationBenítez Santillán, Iván Leonardo. (2016). Propuesta de mejoramiento de los planes de mantenimiento de los equipos criticos de generacion electrica de la Central de Produccion y Facilidades (CPF), utilizando (RCM), en el Bloque 15 de Petroamazonas. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/4474-
dc.descriptionEl campo de producción petrolera del complejo Indillana, bloque 15 de Petroamazonas, impl ementó planes de mantenimiento de los equipos críticos de generación eléctrica de la central de producción y facilidades (CPF), con la metodología del mantenimi ento centrado en la confiabilidad (RCM). El RCM analiza la función cada elemento, para determinar si este se encuentra bajo condiciones inicial es, o si ha perdido su desempeño, mediante esto se desea establecer los modos de falla o causa de daño y det erminar su efecto, para obtener u optimizar los planes de mantenimiento en elementos críticos de un activo. Se analizan los 4 sistemas de generación. Los activos críticos obt enidos han presentado distintos fallos en su tiempo de operación. Pese a que la ocurrencia en la mayoría de l os equipos ha sido considerada como “Remota”, es i mportante conocer el punto de partida en térmi nos de los indicadores de mantenimient o. La redundancia de elementos dentro del Sistema de Generación es evident emente la causa principal de que las calificaciones que se obtienen en las consecuenci as de análisis son i ndicadores que el Sistema es o responde a una buena Confiabilidad. En base al presente trabajo por generación se determinan las tareas adi cionales que serán tomadas en cuenta en los futuros mantenimientos de estas unidades consideradas como críticas en las operaciones de PAM en el CPF. Las guías y protocol os desarrollados permitirán que no existan confusiones en eventos de emergencia antes las eventual es paradas no programadas en los 4 escenarios posibles. Se recomienda la utilización de esta técni ca en todos los equipos que intervi enen en la operación y obt ención de crudo.es_ES
dc.description.abstractOil production in Indillana block 15 in Petroamazonas, i mplemented critical equipment mai ntenance plans t o generate electrical in the production and facilities plant (CPF), by applying the reliability centered maint enance methodology (RCM). The RCM analyzes the function of each element to determine if it is under initial conditions of, or if has lost performance; the purpose is to establish the failure modes or damage cause and determine t he effect, in order t o obtain or optimize the maintenance plans in critical elements of an asset. The four power generation systems were analyzed. The obtained critical assets have presented different flaws i n the operating ti me. Even though the frequency in t he maj orit y of the equipment has been classi fied as "Remote", it is important to know the starting point in terms of maintenance indicators. The redundancy of elements within the Power Generation System is evident, the mai n cause for the obtained qualifications according to the consequences analysis are indicators which show that the s ystem has a good reliability. Based on the results, additional tasks are determinate to be taken int o account for future maintenance of these units considered as critical i n t he PAM and CPF operations. The developed guides and protocols contributes to the inexistence of confusi on i n emergency situations facing with sudden non-planned stops in four di fferent scenarios. It is recommended t o use this technique in all the operation equipment used to obtai n oil.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTIPEC;20T00664-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectRCM MANTENIMIENTO BASADO EN CONFIABILIDADes_ES
dc.subjectSISTEMAS DE GENERACIONes_ES
dc.subjectMOTORES DE COMBUSTION INTERNAes_ES
dc.subjectPETROAMAZONAS EPes_ES
dc.subjectPF CENTRAL DE PRODUCCION Y FACILIDADESes_ES
dc.subjectSUCUMBIOS (PROVINCIA)es_ES
dc.titlePropuesta de mejoramiento de los planes de mantenimiento de los equipos criticos de generacion electrica de la Central de Produccion y Facilidades (CPF), utilizando (RCM), en el Bloque 15 de Petroamazonases_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.contributor.miembrotribunalFreire Miranda, Jorge-
dc.contributor.miembrotribunalAstudillo Machuca, Cesar-
dc.rights.urihttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Maestrias: Modalidad Proyectos de Investigación y Desarrollo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
20T00664.pdf4,64 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons